August 5 PAN 0703-483 (24323) ~ The project is located in Region 1 in Denver county.  The project consists of the removal of all existing timber noise walls betweenTennyson and Lowell on I-70. The timber noise walls will be replaced with concrete post and panel noise walls. TBD Pending
August 5 C 133A-048 (23125) ~ The project is located in Region 3 in Gunnison county.  This project consists of slope stabilization by use of ground anchors, prefabricated concrete panels, and drain pipes.  Repairs on roadway after stabilization. TBD Pending
August 5 STA M086-078 (22166) ~ The project is located in Region 2 in Pueblo county.  This project will replace the signals at SH96 and Prairie Ave (Pueblo) and at US50B Conley RD (Otero). The work will include the removal and replacement of the existing signal poles, ADA ramps replacement at the Pueblo location, boring of conduit, pavement marking removal and replacement, traffic control devices, and other items as shown in the plans and specs. TBD Pending
August 5 SHE 0703-462 (23036) ~ The project is located in Region 1 in Jefferson county.  Project included signal and roadway improvements along with signing. TBD Pending
August 5 STM 067A-047 (24254) ~ This project is located in Region 2 in Teller county.  The project consists of US 24, replace metal grate with an inlet, replace existing end-section at outlet, backfill rills and construct one embankment protector, blade 6" ditch connecting new inlet to existing inlet. TBD Pending
August 5 CC 510-030 (22734) ~ This project is located in Region 1 in Clear Creek County. This project is on County Rd 314 from east Idaho Springs to the Veterans Memorial Tunnels and consists of roadway widening, mse & soil nail walls, rock cuts, storm sewer, concrete shared-use path, pedestrian bridge over Clear Creek, resurfacing, and signing and striping. TBD Pending
July 22 MTCE 0501-075 (23922) ~ This project is located in Region 3 in Delta county. This project will install new conduit, wiring, pedestrian push buttons, vehicle detection, replace controller cabinets, and signal head back plates. Work will be at US 50 MM 71.1 to 71.5 at 3rd, 4th, 5th, and 6th streets No bids Submitted N/A
July 15 SHE R300-261 (23426) ~ The project is located in Region 3 in Delta, Mesa, and Summit Counties at intersections for SH6F MP 215.47, SH139 MP 5.01, and SH 133 MP 7.99 for installation of intersection warning systems.  Work includes sign installation with detection equipment, Red LED lighted rings and solar panels, and new pavement markings. CC Enterprises - Traffic Control Specialists, Inc. Pending
July 8 IM 0252-490 (23421) ~ The project is located in Region 2 in El Paso County on   I-25 for ramp pavement widening and ramp metering signals for Southbound Woodmen, Northbound and Southbound Academy, and Northbound North Gate on-ramps. Work includes removal and installation of pavement, signing, striping, ITS and conduit work, guardrail and minor structure work, erosion control and landscaping. All Bids Rejected N/A
July 8 FSA 172A-020 (21015) ~ The project is located in Region 5 in La Plata County at SH 172 and County Road 318.  Work includes intersection improvements, roadway widening, median construction, lighting installation, and pavement markings. Oldcastle SW Group, Inc.  Pending
July 8

FSA R200-269 (24232) ~ The project is located in Region 2 in various Counties for the installation of centerline rumble strips on several highways. Work also includes removal and installation of signs, epoxy, high-build paint, preformed plastic and thermoplastic pavement markings.

All Bids Rejected  N/A
July 8 MTCE 0702-415 (24427) ~ The project is located in Region3 in Eagle and Garfield Counties on I-70 for installing preformed plastic pavement markings on the centerline skips in both directions from MM 130.0 to 155.0. Kolbe 
Striping, Inc. 
Bid Tab
July 8 MTCE R300-267 (24428) ~ The project is located in Region 3 in various Counties for the removal and replacement of pavement markings on roundabouts on various highways. Kolbe 
Striping, Inc. 
Bid Tab
July 1 MTCE R400-387 (24319) ~ The project is located in Region 4 in various Counties for the removal and replacement of epoxy striping on several highways.  Roadsafe Traffic Systems, Inc.  Bid Tab
June 24 C 2873-205 (23699) ~ This project is located in Region 4 in Boulder county.  The project is a replacement of a signals at two intersections in Longmont. Sturgeon Electric Co., Inc. Bid Tab
June 24 C 0703-452 (22399) ~ This project is located in Region 1 in Clear Creek county.  The project will construct a trail system that includes two project segments near I-70 between MP 235 and 241.8. The work includes a separated shared use path/greenway trail from Idaho Springs to I-70 over Clear Creek west of Veterans Memorial Tunnel and a trailhead at Dumont. The shared use pathway will construct a 10 foot concrete pathway and include the construction of two pedestrian bridges, a shotcrete wall, and improvements around the trail area. The trailhead will construct a paved parking area, information center, and include picnic tables and additional landscape improvements. American Civil Constructors, LLC dba ACC Mountain West Bid Tab
June 10  MP R200-271 (24338) ~This project is located in Region 2 in several counties.  The project will install inlaid preformed plastic pavement marking on I-25. Work will include inlaying of preformed plastic pavement marking, traffic control, and other items as shown in the project plans/specs Roadsafe Traffic Systems, Inc.  Bid Tab
May 27 C0761-237 (23495) ~ The project is located in Region 4 in Morgan & Weld counties.  This is on I-76 MP 55.1-61.9, WB only and includes diamond grinding with sawing & sealing concrete pavement joints, median detour pavement, concrete panel replacement with HMA bond breaker and guardrail work. Castle Rock Construction Co. of Colorado, LLC Bid Tab
May 27 IM R200-268 (23903) ~ The project is located in Region 2 in El Paso & Park counties.  SH 9 - MP 27.77: Slip line and Extend Culvert, Place Grouted Riprap and Riprap at Outlet, Side Slope at Outlet will be graded to 4:1 as noted in Plan Set, Temporary Signal will be used for Traffic Control at this location. American West Construction, LLC Bid Tab
May 13 NHPP R100-252 (20898) ~ The project is located in Region 1 in several counties.  The work consists of removal of portions of present structure, removal of fence and facing block. Concrete patching and concrete stain and more. Hamilton Construction Co.  Bid Tab
May 13 NHPP 025A-034 (20895) ~The project is located in Region 1 in several counties.  This project consists of bridge deck rehab work, fiber wrap, and placing steel stay-in-place formwork. The work will take place on four structures at three separate locations in Region 1. Railroad coordination is required at two locations. SEMA Construction Inc. Bid Tab
May 13 BR1602-139 (19263) ~ The project is located in Region 5 in Archuleta county.  The work involves replacing twin 84" Culverts with a triple cell 14'x10'x92' Pre-Cast Concrete Box Culverts, inlet drop structures, establishing new downstream channel, Guardrail rail, Bridge rail, erosion control, traffic control, sidewalks, and fencing. Oldcastle SW Group, Inc.  Bid Tab
May 6 IM 025A-040 (21324) ~ The project is located in Region 2 in Las Animas county.  The project consist of a roundabout installation at Exit 11 interchange. Flatiron Constructors, Inc. Bid Tab
May 6 SHE 070A-036 (23425) ~ The project is located in Region 3 in several counties.  This project proposes to install enhanced wrong way traffic control with signs and pavement markings as well as wrong way detection systems on 87 off ramps on I70 within Region 3. RDP Barricade Co., LLC dba Colo. Barricade Company Bid Tab
April 29 C0853-120 (23186) ~ The project is located in Region 4 in Weld county.  This project involves constructing a new connector road between US-85 (Bypass) and O Street in Greeley. Salient features include virgin concrete roadway, water quality pond and drainage features, and HMA auxiliary lanes on US-85. Castle Rock Construction Company of Colo., LLC Bid Tab
April 29 NHPP R500-168 (20694)~ The project is located in Region 5 in Ouray county.  Removal of 139 LF of existing cross culvert. Replace with 72 LF of 8x6 CBC and 68 LF of 6x6 CBC. Both CBC will have CIP headwalls and wingwalls, and inlet and outlet protection. This project also includes streambank stabilization on ~680 LF of Red Mountain Creek and extending the EOP to include the existing parking/pullout area on the west side of the highway. Hank Williams, Inc. dba Williams Construction Contractors Bid Tab
April 29 NHPP 0342-063 (23399) ~ The project is located in Region 4 in Weld county.  This project consists of signalization of US 34 and SH 257 ramps. Interface Communications Co. Bid Tab
April 28 NHPP R400-386 (24297) ~ US 287 & SH 40 Passing Lanes Construction Package No. 2 Castle Rock Construction Co. of Colorado LLC Bid Tab
April 22 STM 0212-011 (23522) ~ The project is located in Region 2 in El Paso county.  The project includes construct new diverging diamond interchange at the existing at-grade intersection. Kraemer North America, LLC Bid Tab
April 15 NHPP 006A-063 (21795) ~ The project is located in Region 1 in Jefferson county.  This project proposes to add 4' shoulders (widening) to have a consistent 4' wide shoulder throughout the project limits. This project will also mill/overlay 2.5" of the existing roadway. Safety improvements include: removal/install of existing Type 3 Guardrail (MGS), new Type 3 Guardrail (MGS), rumble strips, and signing/striping. Other aspects include culvert improvements, rock excavation, CBC headwall/wingwall improvements.
APC Construction, LLC
Bid Tab
April 15 NHPP 3852-019 (21854) ~ The project is locating in Region 4 in Yuma county.  This work will consist of 6.29 mile long 2 inch mill with a 4 inch HMA overlay. This section of highway will also include the addition of 6 feet of HMA paved shoulders with embankment for slope flattening. The shoulders will be excavated 1-1/2 feet and filled with 6 inches of R 40 embankment, 6 inches of ABC Class 6 and 6 inches of HMA. There will be new signage in this area along with construction signing and traffic control. Finally permanent pavement markings will be applied. McAtee Construction Co. Bid Tab
April 15 C5502-106 (22810) ~This project is located in Region 5 in La Plata county.  This project is located on US 550 in Durango. The work involves the replacement of signals at US 550 & 9th Street and US 550 & 12thStreet, along with new curb ramps, and the installation of concrete medians on US 550 between 8th Street and 14th Street. Morton Electric  Bid Tab
April 15 NHPP 0242-094 (24053) ~ The project is located in Region 5 in Chaffee county.  Project consists of wildlife fencing along US 24. All Bids Rejected N/A
April 15 SHE 2873-202 (23355) ~ The project is located in Region 1 in Adams county.  The project will update traffic signals, improve pedestrian routes and curb ramps, and replace signal poles at US-36 ramps. Interface Communication Co. Bid Tab
April 15 SHE 030A-037 (22949) ~ The project is located in Region 1 in Denver county.  The project consists of two signal replacements. PAONIA, Inc. Bid Tab
April 15 STM M455-134 (23653) ~ The project is located in Region 4 in Larimer county.  The project consists of ADA ramps improvements in various locations. Colorado Civil Infrastructure, Inc.  Bid Tab
April 8 FSA 0703-478 (23865) ~ The project is in Region 1 in several counties.  Work consists of install and replace Variable Speed Limit (VSL) signs on I-70.  This project will also include installing Microwave Vehicle Radio Detector devices. Morton Electric, Inc.  Bid Tab
April 8  STE C040-050 (21689R) ~ The project is located in Region 2 in El Paso county.  Work will consists of cleaning of existing structure and coating existing structure with paint. All Bids Rejected - Over Budget N/A
April 1 MTCE R300-266 (24219) ~ The project is located in Region 3 in several counties.  This project consists of grinding existing pavement markings and refreshing with inlaid, 4 to 8-inch wide, modified epoxy pavement marking material on the following roadways: I-70, US-40, US-6F, US-9C, US-9D, CO-82, and other highways as determined by the Engineer. Harvey Contractors, Inc. dba American Striping Co. Bid Tab
April 1 STR 0242-075 (21211) ~ The project is located in Region 2 in Park county.  This is a safety improvement project that includes shoulder widening, guardrail, cross slope improvement, HMA overlay, signing and stripping. Tezak Heavy Equipment  Bid Tab
March 24 APR 101-2021 ~ Region 1 On Call Asphalt Paving Services.  This is Two Step bid solicitation for providing on call asphalt paving services. 
Brannan Sand & Gravel, LLC Bid Tab 
March 18 NHPP 0501-070 (22555)~ This project is located in Region 3 in Detla and Mesa county.  Work consists of profile milling and variable depth asphalt leveling with a 2” overlay in both directions.  This project is in several locations. Kilgore Companies, LLC dba Elam Construction Bid Tab
March 18 STR 0961-016 (22839) ~The project is located in Region 2 in several counties. This project is located on SH96C between Ordway and Arlington (MP 106.04 to MP 130.6) and consists of a 1" Leveling course with a 1.5"HMA Overlay with a 5" HMA Mill and Fill through Sugar City. ADA ramps will be replaced at the intersection of SH96 (Adams St.) and Colorado St. Simon Contractors  Bid Tab
March 18 FSA R100-304 (22368R) ~ The project is located in Region 1 in several counties.  Work consists of traffic signal replacement and median intersection improvements including curb ramps upgrades. Lumin8 Transportation Tech, LLC Bid Tab
March 18 NHPP R500-211 (23280) ~ The project is located in Region 5 in several counties.  This project involves improvements to 6 chain station locations throughout Region 5. All locations will have new lighting installed, with some locations having solar powered lighting. Five locations have widening and paving as part of the improvements. Two culverts will be replaced. TRICON 2, LLC Bid Tab
March 18 MTCE R500-215 (24074) ~ The project is located in Region 5 in several counties.  Work consists of striping over existing pavement on both asphalt and concrete pavement types. Kolbe Striping Inc.  Bid Tab
March 18 CR 300-260 (23419) ~ The project is located in Region 3 in several counties.  ADA Curb Ramp improvements upgrading ramps to PROWAG standards in Rifle, Silt, and New Castle in Garfield County on I-70, SH 6, and SH 13. KSK, LLC Bid Tab
March 11 NHPP 070A-030 (21986) ~ This project is located in Region 3 in Mesa county.  The project includes reconstruction and realignment of I-70B, SH 340 and 1st street.  Project will include HMA mill & fill and drainage improvements, and landscaping. Oldcastle SW Group, Inc.  Bid Tab
March 11 MTCE R200-270 (24245) ~ This project is located in Region 2 in several counties.  Work consists of the removal and replacement of preformed thermoplastic pavement markings, such as crosswalks, stop lines, arrows. Harvey Contractors, Inc. dba American Striping Co. Bid Tab
March 11 STM 115A-016 (20787) ~The project is located in Region 2 in Fremont county.  This project consists improving the roadway and drainage at the intersection of State Highways 67 and 115 in the City of Florence city limits. The construction will consist of, but is not limited to, curb and gutter, sidewalk, pavement reconstruction and mill and overlay, ADA ramps, signing, striping, new storm drain, and utility relocations. Tony J. Beltramo & Sons, Inc.  Bid Tab
March 4 C R400-362 (22435) ~ This project is located in Region 4 in Boulder and Larimer county.  This project will replace signal poles and related equipment at three locations in Fort Collins and one in Boulder. Lumin8 Transportation Tech. LLC Bid Tab
March 4 C 0343-044 (23037) ~The project is located in Region 4 in Yuma county.  Project will include the installation ADA compliant concrete curb ramps along US 34. The work consists of removing the existing sidewalks, curbs and gutters. Grading, forming, and pouring the new curb ramps. There will be pavement marking removals and replacements, hot mix asphalt patching work, landscaping, and construction traffic control required on this project. Castle Rock Construction Company of Colo., LLC Bid Tab
Feb 25 NHPP R100-254 (20900) ~ The project is located in Region 1 in several counties.  Bridge repair at 5 locations in Region 1 includes deck rehab, expansion device replacements, and bearing repair. Lobato Construction, LLC Bid Tab
Feb 25 FSA 0141-030 (21866R) ~ The project is located in Region 4 in Jackson and Larimer counties.  The project consists of shoulder widening in 6 location on SH14, west of Ted’s Place. ZAK Dirt, Inc.  Bid Tab
Feb 25 STA 052A-050 (23169) ~ This is located in Region 4 in Weld county. This project will resurface CO52 between MP 44.0 - MP 54.58 with full depth reclamation and HMA overlay. However, full depth reconstruction method will apply to roadway segments where maintaining existing grade is necessary. The project also includes structure rehabilitation, MASH(Manual for Assessing Safety Hardware) compliant guardrail replacement and cross culvert replacement. Martin Marietta Materials, Inc.  Bid Tab
Feb 25 C 0821-109 (22476) ~ The project is located in Region 3 in Garfield county.  SH 82/133 SIGNAL REPLACEMENT Project will replace signals and reconstruct ramps to meet ADA requirements at the following four intersections in Garfield County: CO 133 and Meadowood Dr., CO 133 and Village Rd, CO 82 and 11th St, and CO 82 and 14th St. Casper Electric, Inc.  Bid Tab
Feb 23  CMGC Work Package 1 for the I-70 Dillion Structure Replacement Project. Kraemer North America, LLC Bid Tab
Feb 18 NHPP 1211-094 (22533) ~ This project is located in Region 1 in Jefferson county.  The project includes resurfacing of SH121 from I-70 to 65th.  The project will include curb ramp upgrades, bridge expansion joints work, median installation at 62nd Ave.  Signal detection system. Brannan Sand & Gravel, LLC Bid Tab
Feb 18 STA 0404-060 (22570) ~ This project is located on US 40 in Region 1 in Jefferson county, Genesee to CR 93. Beginning at MP 279.34 and extending to MP 284.89. This project consists of removing 2.5 of existing asphalt pavement and placing 2.5 of HMA. In addition, this project includes restriping existing lane width for wider shoulders eastbound and westbound, cleaning inlets and culverts, replacing guardrail, drainage improvements, and final signing and striping. Martin Marietta Materials, Inc.  Bid Tab
Feb 18 STR 0503-095 (22996) ~ This project is located in Region 2 in Fremont county.  The project is located in Region 2. The work on this project will consist of roadway milling and resurfacing the roadway, roadway widening for a pull out and various accesses, guardrail replacement, sign replacement, roadway patching, and rehabilitation and minor improvements to four structures. A&S Construction Co.  Bid Tab
Feb 18 FSA 0503-094 (22188) ~This project is located in Region 2 in Fremont county.  This project includes median cable barrier with a HMA mow strip on US 50 and some slope flattening on the outside shoulders. Siete, Inc.  Bid Tab
Feb 18 HPP 0252-460 (21832) ~ The project is located in Region 2 in Pueblo county.  I-25 FRONTAGE ROAD(ELIZABETH) EAGLERIDGE TO RIDGE ROAD resurfacing project. Work to include mill and fill, full depth reconstruction, and access reconstruction and other items as shown in the project plans and specifications. Kiewit Infrastructure Co. Bid Tab
Feb 18 FSA 0071-026 (22443) ~ The project is located in Region 4 in Boulder county.  This project will replace existing signal poles and signal equipment with some minor signing and striping at the intersection of SH 119 (Canyon Blvd) and Folsom St. in Boulder. Lumin8 Transportation Tech. LLC Bid Tab
Feb 18 FBR 2854-143 (22865) ~ This project is located in Region 2 in Park county.  On US 285 at MP 172.36: Replace Structure H-13-G with H-13-H over the South Fork of the Platte River. Work will require a 3 month full closure of US 285 with an offsite detour utilizing SH 9 and US 24. The work will include rebuilding the approaches to the bridge and replacing the guardrail. It will also include wetland mitigation and a stream diversion utilized to complete the bridge work.

ZAK Dirt Incorporated

Bid Tab
Feb 18 NHPP 0831-125 (23485) ~ This project is located in Region 1 in Arapahoe county.  This project involves the replacement of damaged concrete pavement panels, curb ramps, joint stitching, signing, and erosion control. Ralph L. Wadsworth Construction Co., LLC Bid Tab
Feb 11 C 142A-004 (23435-Combo) ~ This project is located in Region 5 in Conejos County. The work consists of construction of ADA curb ramps and reconstruction of sidewalk, and curb and gutter at various locations along SH 142 in Manassa. KSK, LLC Bid Tab
Feb 11 STA 0712-016 (21861) ~ This project is located in Region 4 on SH-71D in Morgan County and Washington County from Mile Post 154.54 to 174.357 in both directions. The work consists of applying Chip seal and Overlay to the full width of the existing surface which includes hot mix asphalt, cover coat material (Type1) (Special), emulsified asphalt, striping, and temporary traffic control. A-1 Chipseal Company Bid Tab
Feb 11 STR 0241-066 (23067) ~ This project is located in Region 3 in Chaffee county on US highway 24A from MP 176.0 to 193.8.  The project is an overlay project of 1.5” overlay, guardrail replacement, striping, signing, and traffic control. APC Southern Construction Co., LLC  Bid Tab
Feb 4 STR 141A-050 (23506) ~This project is located in Region 5 on SH 141, from MP 60.63 just passing Crystal Cir. at north end of the Naturita town limits in Montrose County to MP 95.75 at the Montrose - Mesa County Line. The scope includes: top mat/bottom mat asphalt paving, milling, shouldering, upgrading guardrails, replacing bridge rail/culvert/traffic signs, culverts repair, placing centerline rumble strips, and striping. Oldcastle SW Group, Inc.  Bid Tab
Feb 4 NHPP 0853-114 (22845) ~ This project is located in Region 4 in Weld county and will include resurfacing with multiple treatments (RCI, BRST), a siphon replacement, replacement of bridge rail and guard rail, as well as replacement of a couple loop wires. The project takes place on US 85 Northbound and Southbound between milepost 246.00 and milepost 250.50. Coulson Excavating Comp. Inc.  Bid Tab
Feb 4 ITS ITSB-001 (23321R) ~ The project is located in Region 2 in Huerfano and Las Animas counties. The project will be installing a fiber optic backbone cable on I-25 from Walsenburg to New Mexico (MM 50 MM 0), including boring, trenching, fiber installation, pull box and manhole installation, and an ITS node building in Trinidad. Dillie & Kuhn, Inc.  Bid Tab
Feb 4 NHPP 0402-099 (23585) ~ This project is located in Region 3 in Routt county, along US 40, within MP 132.00 to MP 147.50.  The project includes chip seal and pavement markings, and traffic control. Oldcastle SW Group, Inc.  Bid Tab
Jan 28 FSA R100-304 (22368) ~ Work consists of traffic signal replacements, median and intersection improvements including curb ramp upgrades at various locations along SH95/Sheridan Blvd. and along SH2/Colorado Blvd. in the counties of Arapahoe, Denver, and Jefferson. No Bids Submitted  N/A
Jan 21 NHPP 145A-076 (22085) ~ The project is located in Region 5 in several counties.  Project scope includes a resurfacing method called heater repave treatment, which utilizes a recycle depth of 1.5" of existing asphalt followed up with a new 1.5" HMA layer above. Plaining of asphalt along the gutter edges and the full roadway width will be required along certain roadway segments. ADA curb ramp removals of existing and replacement with new ADA compliant curb ramp designs will be required in all towns. Oldcastle SW Group, Inc. Bid Tab
Jan 21 NHPP 1601-080 (21750) ~ The project is located in Region 5 in several counties.  This preventative maintenance project includes replacing and patching damaged concrete pavement, restoring the surface skid resistance and roadway smoothness through diamond grinding, re-sealing joints/cracks, cross-stitching, ADA ramps and re-striping. The work is within the current curb to curb widths of the existing roadway, except for ADA work and other sidewalk replacements. Interstate Improvement, Inc.  formerly Knish Corp. Bid Tab
Jan 21 NHPP R100-346 (23668)~ The project is located in Region 1 in Adams county.  Polyester concrete overlay on three structures located at I-25 and I-270. Additional work includes deck repair, guardrail replacement and replace expansion joint. ABCO Contracting, Inc.  Bid Tab
Jan 14 STR 109A-020 (23189) ~ The project is located in Region 2 in several counties. The overall project area is from MP 0 (SH 160) to MP 31 (Bent County line) on SH 109. The main area of work consists of the entirely of SH 109 with a 1 inch asphalt leveling course with a 1.5 inch asphalt overlay. Included are areas requiring rebuild treatment of 6 inches asphalt over 6-inches aggregate base course. Safety improvements will include upgrading guardrail to meet new 31 inch standards, along SH 109. A&S Construction Co. Bid Tab
Jan 14 NHPP 0361-124 (22796) ~The project is located in Region 1 in Boulder county.  Project includes resurfacing approximately 2.6 miles.  Bridge work including expansion device replacement and class 2 and 3 repair.  Type 3 guardrail upgrades at various locations along the corridor/ramps. Martin Marietta Materials, Inc. Bid Tab
Jan 14 STA 0404-056 (20821) ~ The project is located in Region 1 in Arapahoe county.  The project included resurfacing and drainage, signing, striping, and curb and cutter. Brannan Sand & Gravel, LLC Bid Tab
Jan 14 FBR 0243-091 (22995) ~ The project is located in Region 2 in El Paso county.  Work includes replacing str. H-19-C with double 8' x 8' CBC box, extending 4' x 8' CBC Box, drainage work, embankment, HMA, and Riprap. TEZAK Heavy Equipment Co. Inc. Bid Tab
Jan 14 C 2911-003 (22859) ~ The project is located in Region 5 in Chaffee county.  The work consists of construction or reconstruction of ADA curb ramps and sidewalk at various locations along US 50 & SH 291 in Salida. Western Gravel Constructors, LLC Bid Tab
Jan 7 STR 0505-049 (21776) ~ The project is located in Region 2 in Bent and Otero counties.  The work on this project will consist of roadway resurfacing, roadway widening for passing lanes, guardrail replacement, sign replacement, roadway patching, and RCP culvert installation. A&S Construction Co. Bid Tab
Jan 7 NHPP 0362-038 (21851) ~ The project is located in Region 4 in Washington county.  The project consists of plaining the existing asphalt mat approximately 1 inch in depth and overlay of 2 ½ inches of ho mix asphalt.  The project will include shouldering material with rumble strips and permanent pavement markings. Simon Contractors Bid Tab
Jan 7 CR 400-375 (23062) ~The project is located in Region 4 in several counties.  This project consists of ADA curb ramp retrofit upgrades, including removal of sidewalk and curb ramps, installation of curb ramps, sidewalk, curb & gutter, pavement patching, reset pedestrian push buttons, striping, traffic control and erosion control on multiple highways in Cheyenne, Elbert, Kit Carson and Lincoln Counties. TLM Constructors, Inc.   Bid Tab
Jan 7 NHPP 385A-018 (22437) ~ The project is located in Region 4 in several counties.  This project consists of signal pole removal and replacement, pavement removal, concrete pavement, curb and gutter, sidewalk, curb ramps, signing, striping, erosion control and traffic control at the US 24-385 intersection (Rose Ave & Lincoln St) in Burlington. K.E.C.I. Colorado Inc.  Bid Tab
Jan 7 NHPP0502-079 (21572) ~ The project is located in Region 5 in Saguache county.  US 50 surface treatment project between mile markers 181.62 to mile marker 192.50 for 10.88 miles. 2-1/2" of new HMA to be placed as well as shouldering material and paving of approaches per M&S. A 400 SY section of roadway may require a deep patch fix of damaged roadway. Structures K-11-F and K-11-H, as shown in the plans, will require geotextile, waterproofing (membrane), concrete sealer, sawing and sealing bridge joint and guardrail and end section removal and replacement items. Signing and striping of roadway will be required once paving is complete. APC Southern Construction Co. LLC Bid Tab
Jan 7 IM 0253-246 (20952) ~This project is located in Region 4 in Larimer county. The project consists of bridge preventative maintenance on four structures. The work consists of class 1, 2 and 3 repairs, and removal of asphalt, expansion device replacement, placing a thin bonded overlay or HMA overlay, one approach slab replacement, and striping. Three structures are over I-25 at CR 70, CR 66 and CR 58. The last structure is on US 287, MM 352.153, over the Larimer County Canal. ABCO Contracting, Inc.  Bid Tab
Jan 7 MTCE R400-383 (24093) ~This project is locate in Region 4 in several counties. This project will consist of removing and replacing preformed thermoplastic pavement markings along various segments of highway in the SW quadrant of R4. Roadsafe Traffic Systems, Inc.  Bid Tab
Jan 7 MTCE R400-384 (24095) ~The project is located in Region 4 in several counties.  This project will remove and replace modified epoxy pavement markings on State Highway 14C. RDP Barricade Co., LLC dba Colorado Barricade Bid Tab
Jan 7 BR 071A-021 (23005) ~ The project it located in Region 2 in Otero county.  The work on this project will consist of one bridge replacement, bridge rail / guardrail replacement and roadway reconstruction for bridge approach. TLM Constructors, Inc. Bid Tab