-
Page 601-27
Added on January 20, 2022. Deleted in error, rename f) to e), add back into Section 601 - Subsection 601.16 Paragraph e).
Located in
Business Center
/
…
/
2021 STANDARD SPECIFICATIONS BOOK
/
Errata (Corrections to errors made during the printing process.)
-
Page 716-2
Added October 1, 2021. Please replace misnumbered page 717-2 in "Section 716 - Waterline Materials" with this corrected page numbered 716-2.
Located in
Business Center
/
…
/
2021 STANDARD SPECIFICATIONS BOOK
/
Errata (Corrections to errors made during the printing process.)
-
Pages 105-10, 105-12, 206-1, and 623-5.
Added on April 11, 2022. Page 105-10, the third paragraph from the bottom was added in error, it should be removed. Page 105-12, Table 105-2 was revised in ...
Located in
Business Center
/
…
/
2021 STANDARD SPECIFICATIONS BOOK
/
Errata (Corrections to errors made during the printing process.)
-
Pages 105-29 & 30
Added October 1, 2021. In Section 105.23, Dispute Review Board; mis-numbered 105.23 Section (b) 4. (1), should actually be 105.23 Section (b) 5., with the last ...
Located in
Business Center
/
…
/
2021 STANDARD SPECIFICATIONS BOOK
/
Errata (Corrections to errors made during the printing process.)
-
Pages 106-3 thru 5
Added October 1, 2021. In Section 106.05, Sampling and Testing of Hot Mix Asphalt, revert back to 2019 version of this subsection, revised in error. Also, note ...
Located in
Business Center
/
…
/
2021 STANDARD SPECIFICATIONS BOOK
/
Errata (Corrections to errors made during the printing process.)
-
Pages 206-1 and 623-4
Added on October 5, 2022. The reference to subsection 703.09 should be subsection 703.08. The reference to subsection 703.09 should be subsection 703.08.
Located in
Business Center
/
…
/
2022 Standard Specifications book
/
Errata (Corrections of errors made during the printing process of the printed specs book)
-
Pages 401-10 and 401-11, Section 401.17 Compaction.
Added on October 28, 2022. 401.17 Compaction should end with the following paragraph. " All additional costs associated with construction of the CTS shall be ...
Located in
Business Center
/
…
/
2021 STANDARD SPECIFICATIONS BOOK
/
Errata (Corrections to errors made during the printing process.)
-
Pages 703-1 and 703-7
Added on October 1, 2022. Table 703-1 extra entry /should not have an entry at all. Table 703.12 Entry unit error. Subsection 703.09 Reference Table 703.10 ...
Located in
Business Center
/
…
/
2022 Standard Specifications book
/
Errata (Corrections of errors made during the printing process of the printed specs book)
-
Pages 703-5 and 703-6
Under subsection 703.06, Mineral Filler, in the two paragraphs before Table 703-9, the first reference to Table 703-8 should be Table 703-9 and the second ...
Located in
Business Center
/
…
/
2022 Standard Specifications book
/
Errata (Corrections of errors made during the printing process of the printed specs book)
-
Pg 202-12 incorrect reference to 105.08 10.17.24
Added on October 17, 2024. Page 202-12, fifth paragraph, there is an incorrect reference. Smoothness for this project will be measured by the Department per ...
Located in
Business Center
/
…
/
2023 Standard Specifications book
/
Errata (Corrections of errors made during the printing process of the printed specs book)